Cave and Stairs, 5 July
The first good solid day’s work of the visit – even if we
did stop the hard work just before 15:30.
Gave a first coat of varnish to the wooden banister that
runs between the ground floor an the first floor. Sprayed the entire roof of
the cave with woodworm treatment, applied and removed paint stripper to the
steps of the ground/first floor stairs at the back and sides where the floor
sander will struggle to reach. And did a little filling and rubbing down around
the stairs too.
Sally scrubbed the steps of the stairs with a mix of whiter
spirit and meths to give the bare wood a general clean (before I applied the
paint stripper and she cleaned up a dozen tiles that we need to put up in the
shower-room to replace missing ones. She also had a play with her new sewing
machine – she approves.
Dinner was a very nice chicken stir-fry.
Comments
Post a Comment