Working from Home (in France), 8th July

We’re in France for most of July but, for me, it will be a mix of holiday and ‘working from home’. Today was the first working day (I’ll also be working tomorrow and Friday, this week). It was up at 05:30 and logged on to work by 07:00 (06:00 UK).

While I sat at a computer, for a day almost entirely spent on video calls, Sally rubbed down the exterior frame around the 1st floor balcony’s French doors, finished painting the loo’s ceiling light, and prepped one of the doors of the wardrobe in the main bedroom.

After ‘work’ I put re-puttied the window above the French door Sally had been working on, and cut the roofing felt to size for the garage roof. It about crippled me carrying the rolls up two flights of stairs. I’d guesstimated the roof at 16m2. It came in 7.5m2 rolls so I had gambled on two being enough. Turned out I probably needed 17m2 , so that’ll mean another trip to Leroy Merlin and another €30-40; but I want to do the job properly this time – then again, I thought I’d done a thorough job last year. We have to go back to LM anyway as I bought a pair of lock for the garage doors – and it turns out they are for right opening doors and ours, of course, open to the left.


Laying out the roof felt

Sally goes for a stroll but I’m to shot again and so am typing up the blog.


Comments

Popular posts from this blog

A Night at the Chateau. 4-5 July

Baking Bread without an Oven & Accosting Strangers - 28 & 29 June.

French Delivery Schedules, Big Beds and Creamy Cheese - Saturday 2 June, 2018