More Paint Prep, 9th July
To bed a little later than usual last night, but slept through to
06:45, which is good. After my ‘day in the office’ I worked on the roof light
aperture above the loo, rubbing down the small amount of woodwork, wire
brushing the iron surround (inside and out) and giving it a coat of Hammerite.
Then spent ages on my hands and knees cleaning up the mess I created on the loo
seat and floor.
Not only did I rise late (for me) I’d finished working, and had showered, by 18:00 – so a relaxing evening ahead, and hopefully I’ll feel up to a stroll with Sally.
Talking of Sally, she had a productive day, cleaning the 1st
floor balustrade ready for painting, stripping the two remaining wardrobe doors
and working of the cupboard doors in Serena’s room – trying to get them close a
little better.
Comments
Post a Comment