Lizards, Bats and Bumble Bees - Tuesday 12 June, 2018
Great day today. A full day of work from 9:00 till 18:30,
Sally was stripping the wallpaper in the kitchen; a pig of a job by all
accounts as there were multiple layers of paper and some atypical adhesives in
in use. For my part I was painting some of the doors and windows' metal work (hinges etc) black. I also hung the finally fully painted ground floor front
shutters and painted the window frame in the kitchen.
Sally saw one of our house lizards for the first time; this
on top of us definitely being buzzed by a bat last night – and, on a less
positive note, it appears we have bumble bees nesting in our walls – time for a
bit of internet research as we don’t want to do them any more harm than we need
to.
Our dustbins were also finally delivered today – soon I’ll
be trying to translate the accompanying letters to ensure we comply with
requirements when it comes to using the right coloured ‘sacs’ etc.
| The Ground Floor Shutter Finally Painted. Inside and Out. |
After a full day’s work we headed back to Malemort (30 Kms
away) to visit the local Leroy Merlin (LM) – an ambition of Sally’s. LM is
basically a B&Q Warehouse. Lots of tools, kitchens, showers, flooring, etc.
I suspect we’l be getting LM kitchen units once the house is rewired.
Tomorrow, the plan is to get up
early and get over to Bordeaux and IKEA. This will be a full day as it is a
fair old run – I’ll let you know just how far, tomorrow.
Comments
Post a Comment